Up until the year 2000, asbestos was used as a construction material in many buildings, including but not limited to HM Prisons, local and national government offices, and even town halls. The safe removal of asbestos and asbestos-contaminated materials is hugely important, due to the risk of damage to human health.

All government-run and occupied buildings should be surveyed by professionals to identify any risks. Older, larger buildings such as prisons and those used by the Ministry of Defence are particularly affected.

‘If you are responsible for maintenance of non-domestic premises…you need to identify where it is and its type and condition; assess the risks, and manage and control these risks.’ The Control of Asbestos Regulations 2012

Our qualified professionals here at Edenbeck Ltd are fully able to encapsulate or remove any asbestos present in Government run or occupied buildings. We provide a full service – from survey to final safe and legal disposal of contaminated materials – and will always work around your needs to ensure minimal disruption.

We hold confined space and working at height certificates, and all of our asbestos engineers have been CRB checked, making us the perfect choice for government and local authority premises.

For further information, advice on asbestos removal, or to book a survey, please Contact Us or call 0845 073 8602 to speak to one of our friendly and knowledgeable advisers.

All government-run and occupied buildings should be surveyed by professionals...



Past Projects


Sutton & Surrey East Water PLC
Sutton & Surrey East Water PLC

London Road, Redhill, Surrey RH1 1LF
January 2014 - Present
£125,000

Works were carried out over day shifts. Labour force in access of 5 operatives per shift.

Project highlights included:

  • Removal and disposal of asbestos insulation board
  • Removal and disposal of asbestos containing bitumen adhesive
  • Removal and disposal of asbestos containing thermoplastic tiles
  • Removal and disposal of asbestos insulation
  • Removal and replacement of asbestos soffits and fascia’s using UPVC
  • Installation of access scaffolding

Keltbray

London Road, Redhill, Surrey RH1 1LF
January 2014 - Present
£125,000

Works were carried out over day shifts. Labour force in access of 6 operatives per shift.

Project highlights included:

  • Removal and disposal of asbestos insulation board smoke vents
  • Removal and disposal of asbestos durasteel vent shaft lining
  • Construction of timber asbestos enclosures
  • Installation of internal weather protection to asbestos enclosures
  • Removal and disposal of asbestos insulation board shuttering
London Underground - Old Oak Common Substation

Old Oak Common, Lane Acton, London W3 7DS
August 2015 - February 2016
£400,000

Works were carried out over day shifts. Labour force in access of 20 operatives per shift.

Project highlights included:

  • Removal and disposal of asbestos insulation board
  • Removal and disposal of asbestos cement cable ducts
  • Removal and disposal of asbestos cement sheeting
  • Removal and disposal of asbestos braided cabling
  • Removal and disposal of asbestos cellactite sheeting
  • Removal and disposal of asbestos containing bitumen adhesive
  • Removal and disposal of asbestos containing thermoplastic tiles
  • Removal and disposal of asbestos containing ductwork
  • Removal and disposal of asbestos durasteel firewall panelling
  • Removal and disposal of pigeon dander
  • Removal and disposal of PCB containing oils
  • Removal and disposal of asbestos glazing gaskets to roof sky lights
  • Installation of 175m walk way
  • Installation of temporary works under CDS
  • Fixed scaffolding installation under CDS
  • Welfare provision and site security
  • Installation of site hoarding
Brunel University London

Kingston Lane, Uxbridge, Middlesex UB8 3PH
January 2016 - Present
£150,000

Works were carried out over day shifts. Labour force in access of 5 operatives per shift.

Project highlights included:

  • Removal and disposal of asbestos insulation board
  • Removal and disposal of asbestos containing bitumen adhesive
  • Removal and disposal of asbestos containing thermoplastic tiles
  • Removal and disposal of asbestos insulation
  • Removal and disposal of asbestos containing ductwork
  • Removal and disposal of asbestos glazing gaskets to roof sky lights Works
Capita - Harcourt House

Cavendish Square, London W1G 0PN
August 2015 - December 2016
£100,000

Works were carried out over day shifts. Labour force in access of 6 operatives per shift.

Project highlights included:

  • Removal and disposal of asbestos insulation pipework
  • Construction of timber asbestos enclosures
  • Installation of internal weather protection to asbestos enclosures
  • Removal and disposal of asbestos insulation board
  • Reinsulating of pipework using foil faced insulation
Mace - Moorfield Redevelopment

Moorgate Underground Station, Moorfields, London EC2Y 9AE
January 2015 - Present
£2,200,000

Works were carried out over day and night working and during possessions during the Station. Labour force in access of 30 operatives per shift.

Project highlights included:

  • Removal and disposal of sprayed asbestos insulation to structural beams
  • Removal and disposal of asbestos insulation board
  • Cemprotec encapsulation of asbestos insulation board shuttering
  • Removal and disposal of asbestos cement cable ducts
  • Removal and disposal of asbestos braided cabling
  • Removal and disposal of asbestos cellactite sheeting
  • Removal and disposal of asbestos containing bitumen adhesive
  • Removal and disposal of asbestos containing thermoplastic tiles
  • Removal and disposal of structural concrete and sprayed asbestos to beams
  • Removal and disposal of concrete slab containing sprayed asbestos insulation
  • Removal and disposal of asbestos containing ductwork
  • Removal and disposal of asbestos durasteel firewall panelling
  • Removal and disposal of asbestos insulation board smoke vents
  • Trial holes
  • Installation of temporary works
  • Demolition of lift shaft from ground floor to basement
  • Removal of stair core from ground to basement
  • Removal of lead based paint to facilitate the installation of trimming steels
  • Burning
  • Concrete coring
  • Saw cutting
  • Robotic BROKK demolition
  • Removal of asbestos containing ductwork
  • Removal of Durasteel firewall panelling
  • Fixed scaffolding installation



Jackie Deketelaere
of CMC said

The management and site staff at Edenbeck Ltd were very forward thinking and worked well with all trades onsite throughout the refurbishment works. The works were undertaken in a very proactive manner.