Asbestos Removal in Greater London 0845 073 8602

Here at Edenbeck Ltd, we know only too well how unsettling it can be to have to deal with asbestos removal in commercial premises as well as lead based paint removal, the removal of pigeon dander and other hazardous materials.


We make it as easy as we can for you

  • In depth surveys and meaningful reports
  • Every safety precaution taken
  • All documentation kept up to date
  • Disruption to business kept to a minimum
  • Confidentiality and discretion assured
  • Over 10 year's experience
  • All work compliant with relevant legislation

Asbestos Management in Commercial Premises


We are a business too

We know just how your business could be disrupted if it became necessary to remove or otherwise deal with a substance as dangerous as asbestos within your premises.

As an established supplier to the railway industry and London Underground, we are used to doing our job whilst at the same time ensuring the safety of the public.



Past Projects


Sutton & Surrey East Water PLC
Sutton & Surrey East Water PLC

London Road, Redhill, Surrey RH1 1LF
January 2014 - Present
£125,000

Works were carried out over day shifts. Labour force in access of 5 operatives per shift.

Project highlights included:

  • Removal and disposal of asbestos insulation board
  • Removal and disposal of asbestos containing bitumen adhesive
  • Removal and disposal of asbestos containing thermoplastic tiles
  • Removal and disposal of asbestos insulation
  • Removal and replacement of asbestos soffits and fascia’s using UPVC
  • Installation of access scaffolding
Keltbray

London Road, Redhill, Surrey RH1 1LF
January 2014 - Present
£125,000

Works were carried out over day shifts. Labour force in access of 6 operatives per shift.

Project highlights included:

  • Removal and disposal of asbestos insulation board smoke vents
  • Removal and disposal of asbestos durasteel vent shaft lining
  • Construction of timber asbestos enclosures
  • Installation of internal weather protection to asbestos enclosures
  • Removal and disposal of asbestos insulation board shuttering
London Underground - Old Oak Common Substation

Old Oak Common, Lane Acton, London W3 7DS
August 2015 - February 2016
£400,000

Works were carried out over day shifts. Labour force in access of 20 operatives per shift.

Project highlights included:

  • Removal and disposal of asbestos insulation board
  • Removal and disposal of asbestos cement cable ducts
  • Removal and disposal of asbestos cement sheeting
  • Removal and disposal of asbestos braided cabling
  • Removal and disposal of asbestos cellactite sheeting
  • Removal and disposal of asbestos containing bitumen adhesive
  • Removal and disposal of asbestos containing thermoplastic tiles
  • Removal and disposal of asbestos containing ductwork
  • Removal and disposal of asbestos durasteel firewall panelling
  • Removal and disposal of pigeon dander
  • Removal and disposal of PCB containing oils
  • Removal and disposal of asbestos glazing gaskets to roof sky lights
  • Installation of 175m walk way
  • Installation of temporary works under CDS
  • Fixed scaffolding installation under CDS
  • Welfare provision and site security
  • Installation of site hoarding
Brunel University London

Kingston Lane, Uxbridge, Middlesex UB8 3PH
January 2016 - Present
£150,000

Works were carried out over day shifts. Labour force in access of 5 operatives per shift.

Project highlights included:

  • Removal and disposal of asbestos insulation board
  • Removal and disposal of asbestos containing bitumen adhesive
  • Removal and disposal of asbestos containing thermoplastic tiles
  • Removal and disposal of asbestos insulation
  • Removal and disposal of asbestos containing ductwork
  • Removal and disposal of asbestos glazing gaskets to roof sky lights Works
Capita - Harcourt House

Cavendish Square, London W1G 0PN
August 2015 - December 2016
£100,000

Works were carried out over day shifts. Labour force in access of 6 operatives per shift.

Project highlights included:

  • Removal and disposal of asbestos insulation pipework
  • Construction of timber asbestos enclosures
  • Installation of internal weather protection to asbestos enclosures
  • Removal and disposal of asbestos insulation board
  • Reinsulating of pipework using foil faced insulation
Mace - Moorfield Redevelopment

Moorgate Underground Station, Moorfields, London EC2Y 9AE
January 2015 - Present
£2,200,000

Works were carried out over day and night working and during possessions during the Station. Labour force in access of 30 operatives per shift.

Project highlights included:

  • Removal and disposal of sprayed asbestos insulation to structural beams
  • Removal and disposal of asbestos insulation board
  • Cemprotec encapsulation of asbestos insulation board shuttering
  • Removal and disposal of asbestos cement cable ducts
  • Removal and disposal of asbestos braided cabling
  • Removal and disposal of asbestos cellactite sheeting
  • Removal and disposal of asbestos containing bitumen adhesive
  • Removal and disposal of asbestos containing thermoplastic tiles
  • Removal and disposal of structural concrete and sprayed asbestos to beams
  • Removal and disposal of concrete slab containing sprayed asbestos insulation
  • Removal and disposal of asbestos containing ductwork
  • Removal and disposal of asbestos durasteel firewall panelling
  • Removal and disposal of asbestos insulation board smoke vents
  • Trial holes
  • Installation of temporary works
  • Demolition of lift shaft from ground floor to basement
  • Removal of stair core from ground to basement
  • Removal of lead based paint to facilitate the installation of trimming steels
  • Burning
  • Concrete coring
  • Saw cutting
  • Robotic BROKK demolition
  • Removal of asbestos containing ductwork
  • Removal of Durasteel firewall panelling
  • Fixed scaffolding installation



Jackie Deketelaere
of CMC said

The management and site staff at Edenbeck Ltd were very forward thinking and worked well with all trades onsite throughout the refurbishment works. The works were undertaken in a very proactive manner.